Tel. +91 9884195557 / 8610758878 | terrafirma.info@gmail.com
FLOOD BARRIER SYSTEMS
DO YOU WISH TO BE “FLOOD SAFE”??
Flooding cannot be prevented but we can learn to understand the cause and manage the risk so that we are better prepared. There are processes, methods, systems, technologies through which we can manage flood risk…
We have devised practical, sustainable and economical methods for Rain Water, Storm Water and Flood Management Plan for any site
FLOOD BARRIER SYSTEMS (FBS)
What is TFCS – FBS?
TFCS-FBS (Flood Barrier System) is an innovation from Terra Firma Consultancy Services, based on extensive Research & Development in design engineering, material selection and numerous testing and trials for effectiveness
TFCS-FBS prevent water from entering into the premises of any development. These are modular structures which can be installed within FIVE MINUTES during the time of rains and flood.
TFCS -FBS does not need any electricity to install and to remove.
TFCS -FBS does not need skilled persons to install
TFCS-FBS does not need any tools and tackles for installation and removal
TFCS-FBS can be installed within minutes
EXTREMELY ECONOMICAL
Can be made ready in just 15 days
How Does It Work?
To put it simply, TFCS-FBS is like a “water dam” but can be removed and inserted at will. It works on the principle of static and dynamic water load being offset by the barrier strength and sealing strength. In addition, the specialty of the TFCS-FBS is its UNIQUE DESIGN which uses the water load itself as a barrier.
Costs:
TFCS-FBS are extremely economical as compared with Flood Barrier Systems available all over the world. On average, the cost of 1.0 meter wide x 3 feet height flood barrier is only around Rs.60,000/-. Note that this is subject to change based on site conditions, but will not be above this price. In comparison to International Pricing, an equivalent cost will be not less than Rs.2,00,000/-
Site Works:
TFCS-FBS is extremely flexible engineering product which needs very less site intervention. Our FBS can be installed in virtually any type of ground with little civil works, which may take about 2 days of time
Our client needs to do some very basic civil works which can be completed in about 2 days time…
WHATEVER THE WIDTH……WHATEVER THE HEIGHT…WHATEVER THE SITE CONDITIONS…
WE CAN STOP WATER FROM COMING INSIDE YOUR PREMISES…
Integrated Flood Management Plan


Quantification of rain water accumulation within your site and its receiver types – roof tops, hard surfaces, soft surfaces, earth etc…
Reconnaissance studies and flood water ingress status.
Review of existing drainage information.
Study of current water flow patterns.
Develop master plan for flood water management.
Selection of processes / systems / installations through which effective flood mitigation can be coupled with rain water harvesting and re-use.
Significant flood protection devices and retrofit solutions for existing properties.
Provide a budget and time line for implementation of the same.
Implementation Supervision and Management to ensure that Quality, Time & Cost Plans are properly followed and fulfilled.
Develop Standard Operating Procedures and Maintenance Protocols to ensure effective usage of the system.
CONTACTS

